The Bravo Wind Farm is located in the municipalities of Oleiros and Sertã, in the district of Castelo Branco.
COMMERCIAL OPERATION: 2009
INSTALLED CAPACITY: 16 MW
NUMBER OF TURBINES: 8 (2 MW/turbine)
MODEL / MANUFACTURER: E-82 / ENERCON
The Bravo Wind Farm is situated in the municipalities of Oleiros and Sertã, in the district of Castelo Branco and achieved full commercial operation in 2009.
With a capacity of 16 MW, this wind farm is composed by 8 wind turbines ENERCON E-82, with 2 MW each.